Draft Scheme Documents

The following documents were submitted to the Scottish Borders Council for consideration at their meeting on 23 February 2017:

Scheme Operations

Schedule of Scheme Operations (Filesize 0.6Mb)

Scheme Drawings

Scheme Operations Plans - Part 1 (Filesize 14.2Mb)
Scheme Operations Plans - Part 2 (Filesize 10.4Mb)

Environmental Statement

Draft Environmental Statement - Volume 1: Main Report (Filesize 11.1Mb)
Draft Environmental Statement - Volume 2: Appendix A - Scheme Plans (Filesize 9.6Mb)
Draft Environmental Statement - Volume 2: Appendix B - Figures & Tables (Filesize 84.8Mb)
Draft Environmental Statement - Volume 2: Appendix C - Supporting Documents (Filesize 130.8Mb)
Draft Environmental Statement - Volume 3: Non-Technical Summary (Filesize 5.0Mb)

Construction Methodology

Construction Methodology Report (Filesize 5.3Mb)

Scheme Design Report

Preferred Scheme Report (Filesize 26.8Mb)

Controlled Activities Licence

Controlled Activities Regulations (CAR) - DRAFT APPLICATION (Filesize 13.3Mb)
CAR Application - Appendix D - Option Appraisal Report - Non-Technical Summary (Filesize 0.3Mb)
CAR Application - Appendix D - Option Appraisal Report - Main Report (Filesize 14.4Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix A - Drawings (Filesize 25.3Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix B - Scheme Objectives (Filesize 0.2Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix C - Economic Appraisal Report (Filesize 29.0Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix D - GI Data (Filesize 68.5Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix E - Natural Flood Management (Filesize 2.4Mb)
CAR Application - Appendix D - Option Appraisal Report - Appendix F - Public Exhibition Report (Filesize 0.7Mb)

The above information has been prepared in accordance with the various legislative requirements for taking forward the Hawick Flood Protection Scheme (HFPS). This information is being made publicly available at this time in order to support the Project Team's recommendation to Scottish Borders Council that the HFPS is to be taken forward under that legislation.

This information is currently in an advanced draft status, but may be subject to minor alteration between now and the formal approvals process, which is currently scheduled for late April 2017.